Current trends from Karachi Strategic Development Plan 2020

 

 

ELECTRICAL POWER

Power Generation

Station

Available Capacity (MW)

Source of Energy

Bin Qasim Power Station

1130

Natural Gas and Furnace Oil

Korangi Power Station

215

Natural Gas and Furnace Oil

SITE Gas Turbine Power Station

90

Natural Gas

Korangi Gas Turbine Power Station

72

Natural Gas

TOTAL

1507

 

(Source: Karachi Strategic Development Plan 2020: CDGK – 2007)

 

 

KESC Operating Capacity, 2004-05

Demand and Load Factor

Description

MW

Actual Capacity

1,387*

Evening Peak Demand

2,197

Day Peak Demand

2,104

Base Demand (Night)

860

Load Factor

70.25%

*BQPS Units 2, 3 & 5 were under restoration.

(Source: Karachi Strategic Development Plan 2020: CDGK – 2007)

 

Other Contributing Plants to Karachi’s Power Needs:

Tapal Energy (IPP)

114 MW

Gul Ahmed Energy (IPP)

113 MW

Kanupp (Karachi Nuclear Power Plant)

40 MW

PASMIC (Pakistan Steel Mills)

10 MW

WAPDA (NTDC)

500 MW

Total

777 MW

(Source: Karachi Strategic Development Plan 2020: CDGK – 2007)