Current trends from
Karachi Strategic Development Plan 2020
ELECTRICAL
POWER
Power
Generation
|
Station
|
Available Capacity (MW)
|
Source of Energy
|
|
Bin Qasim Power Station
|
1130
|
Natural
Gas and Furnace Oil
|
|
Korangi Power Station
|
215
|
Natural
Gas and Furnace Oil
|
|
SITE Gas Turbine Power Station
|
90
|
Natural
Gas
|
|
Korangi Gas Turbine Power Station
|
72
|
Natural
Gas
|
|
TOTAL
|
1507
|
|
(Source: Karachi Strategic Development Plan 2020: CDGK –
2007)
KESC
Operating Capacity, 2004-05
Demand
and Load Factor
|
Description
|
MW
|
|
Actual Capacity
|
1,387*
|
|
Evening Peak Demand
|
2,197
|
|
Day Peak Demand
|
2,104
|
|
Base Demand (Night)
|
860
|
|
Load Factor
|
70.25%
|
*BQPS Units 2, 3 & 5 were under restoration.
(Source: Karachi Strategic Development Plan 2020: CDGK –
2007)
Other
Contributing Plants to Karachi’s Power Needs:
|
Tapal Energy (IPP)
|
114
MW
|
|
Gul Ahmed Energy (IPP)
|
113
MW
|
|
Kanupp (Karachi Nuclear Power Plant)
|
40
MW
|
|
PASMIC (Pakistan Steel Mills)
|
10
MW
|
|
WAPDA (NTDC)
|
500
MW
|
|
Total
|
777 MW
|
(Source: Karachi Strategic Development Plan 2020: CDGK –
2007)
|